Installation of 2,400’ of new road for a 34 lot subdivision. This project included over 1,600' of gravity sewer main, 1,500’ of forced sewer main, 2,000’ of 8” ductile iron water main, 2,225’ of drainage pipe. We stripped and stockpiled over 7,000 yards of topsoil, exported 16,000 tons of material from this site and prepped for 45,000 sq ft of new road with material we processed on site.

Client:

Roswell Development, LLC

Future Use:

Developed into a 34 house neighborhood

Project Scope